Pre-construction Piers

Are you a contractor looking to use our piers?

Got questions? We’re here to help

Understanding our pier

Education is important to making informed decisions

icon
Concentrically Loaded and Driven

Pushed straight and centered under footing/foundation for optimal structural support. No bolts,no brackets, no cutting the footings.

icon
Proper Position

Our double-walled, heat-extruded steel tube is positioned directly under the center of the wall to be lifted or stabilized.

icon
Strongest Support

The pier is hydraulically driven all the way to bedrock or stable strata, providing the deepest, strongest foundation support available.

icon
Method of install

All you need is a skid steer and a Stabil-Loc drive head. 82,000lbsof force is delivered to the pier driving it to bedrock

icon
Lifetime Warranty

This pier is built to last indefinitely, offering unparalleled strength and reliability in the market, providing lasting peace of mind for your build once installed

icon
Patented Pier

Our piering system is so revolutionary, it is patented by the United States Patent Office. (Patent numbers: US 8,851,800 B2, US 8,821,073 B2, and US 8,206,063 B2)

Pier before you build

The mechanically driven Stabil-Loc pre-construction pier is installed prior to pouring the foundation in areas of unstable soils. Future settlement of the structure is no longer a concern. The ICC compliant Stabil-Loc pre-construction pier consists of a 30” long starter segment, 30” long interlocking segments, terminated by a 100 square inch gusseted top bearing cap.

Installation in 5 easy steps

Engineering that makes sense

image

Step 1

The recommended spacing is measured and the location of the pier is marked in the footing trench.

image

Step 2

The installation machine drives the piers with 82,000 pounds of impact force, resulting in the piers being driven all the way to solid rock, as opposed to relying on the flights of a helical pier to hold the weight of the structure against undisturbed soil only.

image

Step 3

The offset interlocking tubes are then cut off evenly. This creates a double steel wall pier all the way from the foundation of the structure to solid rock.

image

Step 4

TThe gusseted top cap is placed on top. In areas of heaving, the segments can be welded together as they are installed to create uplift resistance. This is provided by the skin friction against the shaft of the pier.

image

Step 5

The reinforcing steel is then placed on top of the piers in the trench and the concrete is poured. The result is an inexpensive insurance policy against future settlement of the structure.

Why partner with us?

CLCD White

Our foundation piers are engineered to perfection. As we stand by our product and it’s efficiency, every pier installation comes with a lifetime warranty—no questions asked. Every foundation repair service comes with a free Certified Structural Evaluation®, a training program that turns contractors into authorized and licensed technicians.

Coming soon for contractors... a personalized Stabil-Loc branded web platform for your company to showcase your work, gain customers, and spread brand awareness at the touch of your fingertips.

Partner with Stabil-Loc?

If you’d like to learn more about our Contractor & Engineer Partnerships, please simply fill out this contact form. A representative will contact you shortly!
Thanks in advance for your interest

Reach us @ 479 - 282 - 9298